The first public announcement of the environmental impact assessment for the construction project of an intelligent co-extrusion wood-plastic factory with an annual output of 80,000 tons by Terrasta New Materials (Liaoning) Co., Ltd.
(一) Project Name and Overview
Project Name: Terratsa New Materials (Liaoning) Co., Ltd. - Annual Production of 80,000 Tons Co-extruded Wood-Plastic Intelligent Factory Construction Project
Project Overview:
Terratsa New Materials (Liaoning) Co., Ltd. is located in the Yingtong area of China (Liaoning) Pilot Free Trade Zone, north of Yongyuanjiao Second Street and east of Tiancheng Road, Yingkou City, Liaoning Province. The planned investment is 325.316 million yuan, with an additional construction area of 43,004 square meters and 468 sets of equipment and facilities. There will be a total of 50 production lines for co-extruded wood-plastic materials, with an annual production capacity of 80,000 tons.
(二) Name and Contact Information of the Construction Unit
Construction Unit: Terratsa New Materials (Liaoning) Co., Ltd.
Contact: Zhou Ping
Phone: 18904172606
Address: Yingtong area of China (Liaoning) Pilot Free Trade Zone, north of Yongyuanjiao Second Street and east of Tiancheng Road, Yingkou City, Liaoning Province
(三) Name of the Environmental Impact Assessment (EIA) Report Preparation Unit
EIA Unit: Liaoning Green Source Ecological Environment Technology Co., Ltd.
Contact: Bo Yang
Phone: 13609813121
Email: dingwentao1985@163.com
Address: No. 1-14-1, Changjiang South Street, Huanggu District, Shenyang City, Liaoning Province
(四) Link to the Public Opinion Form
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
(五) Ways and Channels to Submit the Public Opinion Form
During the public notice period, the public can provide their opinions and suggestions on the construction of this project and the EIA work to the construction unit through phone, fax, mail, email, and other means. To better understand the specific opinions and suggestions of the public, please provide detailed contact information when submitting opinions.
(六)Start and End Dates of the Public Notice Period
During the preparation of the draft EIA report (before the second public notice), the public can provide comments related to the environmental impact assessment to the construction unit.
Public Notice Period: August 12, 2021, to August 25, 2021
Ways and Channels to Submit the Public Opinion Form: dingwentao1985@163.com
一次公示--庭然新材料(辽宁)有限公司2021.8.11.docx